BlendCraft · Buyer working record · Version 1.0 · 2026-10-27

Makeup Sponge
Inspection Record

Identify the product, record the method and evidence, and keep sample approval separate from the shipment decision.

Scope: unfilled, uncoated hydrophilic PU makeup sponges. Adapt the record for other constructions. This blank worksheet contains no inspection results, certified methods or preassigned acceptance limits.

Start with sections 1, 2, 4 and 7. Complete method details for the checks performed. Open the sampling section for a lot decision, and the finding section when an issue needs action. The record does not approve goods automatically.

Click a field to type. Changes remain in this open document until you save a filled copy or print. Saving a filled HTML copy preserves the editable text. Print includes the additional sections. The document makes no network requests.

1. Product and inspection stage

Buyer / project / PO
Stage
SKU / shape / color / material version
Supplier / sample source / lot ID
Lot quantity / inspection unit / pack configuration
Inspector / date / location
Intended use / formula reference / destination market

2. Approval basis and change control

Specification / drawing / artwork / pack versions
Reference sample ID / approval date / condition
Agreed document priority / unresolved differences
Change requested / affected checks / approval and version
3. Method setup and independent specimens

BC-SP-DIM-01, BC-SP-MASS-01 and BC-SP-TRANSFER-01 draft 0.1 are proposed buyer workflows in the companion manuscript. Their physical trials are pending. Record the actual agreed profile here; DEMO settings are teaching examples.

Method / profile ID / version / status
Requirement source / acceptance criterion / approval
Unit IDs / test group / source / prior treatment history
Baseline / conditioning / environment
Equipment / ID / resolution / check
Water / volume / temperature / immersion / action
Drainage or dewatering / support / timing
Contact transfer / face / medium / load / dwell / movement
Formula / dose / preparation / surface / action
Loading / recovery / cleanser / cycle / drying
Photo setup / lighting / background / evidence location
Method deviations / timing misses / repeatability concerns

4. Results and check decisions

Use a separate row per check and unit where needed. Keep raw readings and units. A check decision is separate from final sample approval or lot disposition.

Available statuses: Not tested · Pending requirement · Pass · Fail · Hold for review · Not applicable—with reason
Check / unit IDState / method versionRequirement / sourceRaw result / unitEvidence / deviationCheck status / reason
Not tested
DimensionsWet height / baseline height = corresponding height ratio. Height change (%) = (wet − baseline) / baseline × 100. Record the exact states and direction; this is not volume change.
MassAfter-procedure mass − baseline mass = mass difference under that procedure. Keep conditions and units. This is not a foundation-saving percentage.
5. Shipment sampling and evidence

Complete for a lot decision. Use the full applicable plan and product requirements. Do not treat the teaching example's specimen quantity as a shipment sample size.

Lot boundary / inspection unit / configuration coverage
Plan / standard / edition / scheme / applicability
Inspection level / severity / plan type / switching basis
AQL / sample size / acceptance-rejection parameters
Selection procedure / box or location IDs
Inspected quantities / performance / destructive / lab allocation
Nonconforming units / observation counts / classification
Arrival / unpacking / later observation / packaging versions
Claim / document ID / configuration match / method / date / evidence status
6. Findings, correction and reinspection
Finding ID / unit / location / affected configuration
Required condition / observation / classification and reason
Containment / correction / action owner
Reinspection plan / scope / result / evidence

7. Final decision and authorization

Sample approval decision / basis / scope
Not assessed
Lot disposition / basis / scope
Not assessed
Outstanding requirements / evidence / next action
Decision authorizer / role / date
Record ID / revision / retained evidence location

Use Hold for review when the decision basis is incomplete. A signed sample approval does not automatically release a lot. Blank fields, a download, or this worksheet's calculations are not approval.